Yong* Wheel Boiler Deep Cleaning Project
When Yong*lun Boiler entered the factory to check the condition of the tobacco pipe, there were 780 pipes in the main smoke chamber, with a total of 80 half-blocked and fully blocked smoke pipes, accounting for 10% of the total number of pipe bundles. The blockages were dense. Our company used high-pressure water jets to block the smoke chamber, which had good results. At the same time, according to the owner's request, the water jet pipe wall was cleaned and maintained.